WPS Development & Procedure Documentation
WPS development is a -rate documentation service. Where the governing code requires a supporting PQR, that procedure qualification work is separate.
Request a Project Quote Call (810) 289-8108What to expect
WPS creation is . If a new supporting PQR is required, PQR testing is plus CWI observation at in four-hour blocks (), plus for travel. We check the governing code before determining whether qualification testing is necessary.
Services and support
WPS development
Prepare procedure specifications using the applicable qualified data and code requirements.
Supporting PQR review
Identify whether existing PQR records support the proposed procedure and intended scope.
New PQR qualification
Coordinate a new procedure qualification when the existing qualification basis is insufficient or absent.
Code and revision control
Document the governing code/edition, supporting records, and revision information.
Frequently asked questions
Is the WPS even if a PQR is needed?
The is for WPS creation only. PQR testing, observation, and mileage are additional if new qualification work is required.
Does every WPS need a PQR?
Not always. Some codes permit prequalified procedures or exceptions. The governing code and the work being performed determine what is required.
Discuss your project requirements
Tell us the governing code and edition, project location, schedule, materials, weld processes, and the qualification or inspection scope. We'll confirm the applicable work and provide a quote.
Request a QuoteMichigan-based. Regional service available by request.